Crews completed a major concrete pour this weekend for the new double-decked S.R. 836 roadway just west of the Miami River. The operation used one concrete pump and approximately 60 concrete trucks to place 590 cubic yards of concrete — roughly 2.4 million pounds — as crews continue advancing construction of the new elevated roadway.
Photos and video shown below highlight the concrete pour operation.





RESCHEDULED: EXTENDED FULL CLOSURE OF EASTBOUND S.R. 836 AT NW 17 AVENUE

- Saturday, October 10 through Sunday, October 11 – All eastbound S.R. 836 travel lanes will be closed at NW 17 Avenue starting at 11 p.m. on Saturday, October 10, until 10 a.m. on Sunday, October 11, to place the reinforcing steel cage for a bridge support structure over the roadway safely. Two lanes from NW 17 Avenue to I-95 will close at 10 p.m. before the full closure. The detours noted below and shown HERE will be in place to guide drivers around the work area. Drivers on eastbound S.R. 836 will:
- Exit at NW 17 Avenue, then continue south across NW 7 Street
- Turn left at SW 1 Street and continue east
- Turn right at South Miami Avenue
- Turn right to access the ramp to I-95 north or south
- Drivers going to Biscayne Boulevard and the MacArthur Causeway can continue east on SW 1 Street and turn left on Biscayne Boulevard to connect with the MacArthur Causeway entrance ramp at NE 11 Terrace
Drivers on NW 12 Avenue wanting to access eastbound S.R. 836, I-95, Biscayne Boulevard, and the MacArthur Causeway can continue south on NW 12 Avenue, turn left at SW 1 Street, and follow the detours above.
FULL CLOSURE OF WESTBOUND I-395 AT I-95
- Saturday, October 10 – All westbound I-395 travel lanes continuing onto westbound S.R. 836 will be closed at I-95 between the hours of 11:59 p.m. and 7 a.m. The I-395 ramps to northbound and southbound I-95 will remain open. Drivers can:
- Access the southbound I-95 ramp
- Exit at SW 7 Street/Brickell Avenue (Exit 1B), then turn left at SW 8 Street
- Enter the northbound I-95 ramp, then exit at the westbound SR 836 ramp
To view a map of the detour, please click here.
I-95 ONGOING CONSTRUCTION ACTIVITIES
- All new concrete pavement has been completed from NE 17 Street to NW 29 Street, as well as along northbound I-95 from NW 8 Street to NW 17 Street.
- To date, approximately 138 million pounds of concrete have been used to replace the existing pavement, enhancing safety and increasing the long-term durability of this heavily traveled corridor.
- Continued concrete pavement replacement along remaining sections of southbound I-95 between NW 17 Street and NW 8 Street
- Installation of Intelligent Transportation System (ITS) devices along the corridor
- Traffic railing retrofits on several bridges within the project limits
I-95 LANE CLOSURES
- Wednesday, October 7 through Friday, October 9 and Sunday, October 11 through Friday, October 16 – Up to two lanes on southbound I-95 from NW 29 Street to NW 8 Street will be closed as needed between 9 p.m. and 5:30 a.m. The Friday closures will be implemented between 11 p.m. and 8 a.m.
- Wednesday, October 7 through Friday, October 9 and Sunday, October 11 through Friday, October 16 – Up to two lanes on northbound I-95 will be closed as needed from NW 8 Street to NW 29 Street between 9 p.m. and 5:30 a.m. The Friday closures will be implemented between 11 p.m. and 8 a.m.
SOUTHBOUND I-95 RAMP TO EASTBOUND I-395 DETOUR
- Tuesday, October 13 through Thursday, October 15 -The southbound I-95 ramp to eastbound I-395 will be closed between the hours of 10 p.m. and 5:30 a.m. Drivers can:
- Continue south on I-95, exit at the NW 8 Street ramp (Exit 3B)
- Turn left on NW 8 Street, continue east on NW 8 Street
- Turn left at Biscayne Boulevard to access the A1A North/Miami Beach Ramp
To view a map of the detour, please click here.
I-395 ONGOING CONSTRUCTION ACTIVITIES
Signature Bridge
- Advancing construction of the first of three cast-in-place starter arch elements for each of the two remaining signature bridge arches
- Construction of MSE walls that will connect the westbound signature bridge roadway deck to the MacArthur Causeway
- Falsework installation adjacent to Biscayne Boulevard
- Ongoing drainage improvements throughout the corridor
- Continued installation of reinforcing steel, falsework and formwork, along with concrete pours for the westbound signature bridge roadway deck spanning NE 2 Avenue and Biscayne Boulevard
I-395 Segmental Bridges Connecting the Signature Bridge to I-95 and S.R. 836
- Daytime and nighttime installation of precast roadway segments, along with construction of concrete caps and columns from NW 1 Place to the Midtown Interchange
- Construction of substructure elements for the new pedestrian bridge over the FEC rail tracks
- Ongoing roadway improvements along I-395 from the MacArthur Causeway to I-95
- Installation of bridge beams between NW 3 Avenue and the Midtown Interchange for the new I-395 connection to S.R. 836
- Continued roadway and bridge work in preparation for the upcoming opening of the new westbound I-395 ramp to southbound I-95
- Ongoing roadway work to open a second lane on the southbound I-95 ramp to eastbound I-395
NOTE: Nearby residents and businesses may experience periods of higher-than-normal noise levels during these activities. All efforts are being made to minimize noise levels to the fullest extent possible
I-395 MAINLINE LANE CLOSURES
- Wednesday, October 7 through Friday, October 9 and Sunday, October 11 through Friday, October 16 – One lane on mainline eastbound I-395 will be closed as needed from I-95 to Biscayne Boulevard between 10 p.m. and 5:30 a.m.
- Wednesday, October 7 through Friday, October 9 and Sunday, October 11 through Friday, October 16 – Up to two lanes on mainline westbound I-395 will be closed as needed from Biscayne Boulevard to I-95 between 10 p.m. and 5:30 a.m.
FULL CLOSURE OF BISCAYNE BOULEVARD, NE 13 STREET AND SOUTHBOUND NORTH BAYSHORE DRIVE
- Wednesday, October 7 through Friday, October 9 and Sunday, October 11 through Friday, October 16 – The following closures will be implemented between 10 p.m. and 6 a.m. for drainage and roadway work. Daytime lane closures will also be necessary at times. The start and end times will be adjusted on special event days.
- All northbound and southbound lanes on Biscayne Boulevard from NE 14 Street to NE 11 Terrace
- All lanes on NE 13 Street from N Bayshore Drive to NE 2 Avenue
- All southbound lanes on North Bayshore Drive from NE 14 Street to NE 13 Street
To view a map of the detour, please click here.
FULL CLOSURE OF NE 2 AVENUE
- Thursday, October 8 – All lanes on NE 2 Avenue will be closed between NE 13 Street and I-395 between 8:30 p.m. and 6 a.m.
- Drivers on southbound NE 2 Avenue can:
- Turn left on NE 14 Street, then turn right on Biscayne Boulevard
- Turn right on NE 11 Street to connect with NE 2 Avenue
- Drivers exiting I-395 can:
- Continue east on NE 11 Terrace, then turn left on Biscayne Boulevard
- Turn left on NE 13 Street to connect with NE 2 Avenue
- Drivers on southbound NE 2 Avenue can:
To view a map of the detour, please click here
DAYTIME FULL CLOSURE OF NW 14 STREET

- Through Friday, October 30 – NW 14 Street from NW 3 Avenue to NW 1 Place will be closed Monday through Saturday, between 8:30 a.m. and 4 p.m., to erect precast roadway segments. Drivers and pedestrians can use the detours shown here.
- Drivers on eastbound NW 14 Street can:
- Turn right on NW 3 Avenue, then turn left on NW 13 Street
- Turn left on NW 1 Place to connect with NW 14 Street
- Drivers on westbound NW 14 Street can:
- Turn right on NW 1 Place, then turn left on NW 16 Street
- Turn left on NW 2 Avenue to continue onto NW 16 Street
- Turn left on NW 3 Avenue to connect with NW 14 Street
- Drivers on eastbound NW 14 Street can:
DAYTIME LANE CLOSURES ON BISCAYNE BOULEVARD
- Wednesday, October 7 through Friday, October 9 and Sunday, October 11 through Friday, October 16 – Single lane closures on northbound and southbound Biscayne Boulevard will be implemented as needed from NE 11 Street to NE 14 Street between 9 a.m. and 3:30 p.m.
NW 1 PLACE DETOUR
- Monday, October 12 through Friday, October 16 – NW 1 Place will be closed from NW 13 Street to NW 14 Street between 9 a.m. and 4 p.m. to move a crane across the roadway. Drivers can use NW 2 Avenue as an alternate route.
NW 2 AVENUE DETOUR
- Wednesday, October 7 through Friday, October 9 and Monday, October 12 through Friday, October 16 – NW 2 Avenue will be closed from NW 13 Street to NW 14 Street between the hours of 10 p.m. and 5:30 a.m. The closure is necessary to allow the contractor to move a crane across the roadway. Drivers should follow the posted detour routes.
S.R. 836 ONGOING CONSTRUCTION ACTIVITIES
- Nighttime installation of precast bridge pier cap segments and beams for the new S.R. 836 double-decked roadway, from over the Miami River to the Health District area
- Preparations to reconstruct the entire fendering system in the Miami River
- Tying reinforcing steel for the straddle bent support structure over eastbound S.R. 836, just west of NW 7 Avenue
- Installation and removal of steel sheet piling in the S.R. 836 median between NW 12 Avenue and I-95 to support ongoing construction
- Continued foundation construction in the S.R. 836 median and along adjacent roadways from NW 12 Avenue to I-95 for the new double-decked roadway
- Construction of support piers for the double-decked roadway within the Midtown Interchange
- Installation of stay-in-place forms and reinforcing steel in preparation for concrete deck pours for the new double-decked roadway
NOTE: Nearby residents and businesses may experience periods of higher-than-normal noise levels during these activities. All efforts are being made to minimize noise levels to the fullest extent possible.
S.R. 836 LANE CLOSURES
- Wednesday, October 7 through Friday, October 9 and Sunday, October 11 through Friday, October 16 – Two eastbound lanes on S.R. 836 from NW 17 Avenue to I-95 will be closed as needed for bridge work between 9 p.m. and 5:30 a.m. The Friday closures will be implemented between 11 p.m. and 8 a.m.
- Wednesday, October 7 through Friday, October 9 and Sunday, October 11 through Friday, October 16 – Two westbound lanes on S.R. 836 from I-95 to NW 17 Avenue will be closed as needed for bridge work between 9 p.m. and 5:30 a.m. The Friday closures will be implemented between 11 p.m. and 8 a.m.
COMPLETE CLOSURE OF EASTBOUND S.R. 836 AT NW 17 AVENUE
- Wednesday, October 7 through Friday, October 9 and Sunday, October 11 through Friday, October 16 – All eastbound S.R. 836 travel lanes will be closed at NW 17 Avenue between 10 p.m. and 5:30 a.m. The start and end times will be adjusted on special event days.
The detours noted below and shown here will be in place to guide drivers around the work area. Drivers on eastbound S.R. 836 will:- Exit at NW 17 Avenue, then continue south across NW 7 Street
- Turn left at SW 1 Street and continue east
- Turn right at South Miami Avenue
- Turn right to access the ramp to I-95 north or south
- Drivers going to Biscayne Boulevard and the MacArthur Causeway can continue east on SW 1 Street and turn left on Biscayne Boulevard to connect with the MacArthur Causeway entrance ramp at NE 11 Terrace
Drivers on NW 12 Avenue wanting to access eastbound S.R. 836, I-95, Biscayne Boulevard, and the MacArthur Causeway can continue south on NW 12 Avenue, turn left at SW 1 Street, and follow the detours above.
FULL CLOSURE OF WESTBOUND S.R. 836
- Wednesday, October 7 through Friday, October 9 and Sunday, October 11 through Friday, October 16 – All westbound lanes on S.R. 836 will be closed as needed from NW 12 Avenue to NW 17 Avenue between 10 p.m. and 5:30 a.m. The closure on Fridays will occur between 11 p.m. and 8 a.m. The start and end times will be adjusted on special event days. Drivers can:
- Exit at the NW 12 Avenue ramp, then turn left on NW 12 Avenue
- Turn right on NW 7 Street
- Turn right on NW 27 Avenue and continue north to connect with the westbound S.R. 836 ramp
To view a map of the detour, please click here.