EXTENDED FULL CLOSURE OF EASTBOUND SR 836 AT NW 17 AVENUE AND TEMPORARY CHANGE OF DRAWBRIDGE OPERATION SCHEDULE

Friday, October 3 and Friday, October 10 – All eastbound SR 836 travel lanes will be closed at NW 17 Avenue starting at 10 p.m. on Friday until 10 a.m. on Saturday morning to place steel reinforcing cage into the formwork for a straddle bent (bridge support structure) over the roadway safely. The detours noted below and shown here will be in place to guide drivers around the work area. The start and end times will be adjusted on special event days. Drivers on eastbound SR 836 will:
- Exit at NW 17 Avenue, then continue south across NW 7 Street
- Turn left at SW 1 Street and continue east
- Turn right at South Miami Avenue
- Turn right to access the ramp to I-95 north or south
- Drivers going to Biscayne Boulevard and the MacArthur Causeway can continue east on SW 1 Street and turn left on Biscayne Boulevard to connect with the MacArthur Causeway entrance ramp at NE 11 Terrace
Drivers on NW 12 Avenue wanting to access eastbound SR 836, I-95, Biscayne Boulevard, and the MacArthur Causeway can continue south on NW 12 Avenue, turn left at SW 1 Street, and follow the detours above.
STATE ROAD (SR) 968/WEST FLAGLER STREET AND SW 1 STREET BRIDGES NOTICE OF TEMPORARY CHANGE TO THE DRAWBRIDGE OPERATING SCHEDULE
The Florida Department of Transportation is authorized to temporarily deviate from drawbridge operation according to regulation 33 CFR 117.305(b) which governs the SW 1st Street Bridge, mile 0.9, and the West Flagler Street Bridge, mile 1.0, across the Miami River.
Under this temporary deviation, the SW 1st Street and the West Flagler Street bridges are allowed to operate as follows:
- From 6 a.m. to 10 a.m., the bridges will open on the hour and half-hour on the following Saturdays, October 4 and October 11.
At all other times, the bridges will operate per their normal operating regulation. Public vessels of the United States, tugs, tugs with tow, and vessels in distress shall be passed at any time. This authorization is in support of the SR 836 highway closure. The U.S. Coast Guard will announce the temporary change to the bridge operating regulations in the Local Notice to Mariners and via a Broadcast Notice to Mariners.


